set up Roof-top Solar PV Power Plant

To set up Roof-top Solar PV Power Plants required documents:-
(1) Details of Roof Area, with location / site for setting up Roof-top Solar PV Power Plants. It includes lease agreement, copy of building ownership, etc.
(2) Estimated project cost, with detailed break-up;
(3) (a) Application / BoM duly signed by the Officer of the project;
(b) Application / BoM duly certified by the Chartered Engineer
(4) Detailed Project Report (DPR)
(5) Copy of EPC Contract or Agreement
(6) Single Line Diagram (SLD)/ Detailed Drawings with justification of requirement of cable; Module mounting structures, Inverter, etc.
(7) One Affidavit in the MNRE prescribed format

The Bill of Material (BOM) shall be submitted to MNRE online.

In case, the project developer or organization has received capital subsidy for setting up a Roof-top Solar PV Power Plant, they will furnish copy of the approval letter sanctioning subsidy for that plant.

Popular posts from this blog

Solar energy consulting & management services, detailed project report, energy management consultants, 1 Kw Rooftop Solar System should be for every house

1kw solar power plant specification

Industrial Vocational Training for Engineering Students

MANPOWER REQUIREMENTS FOR SOLAR PV DEVELOPMENT

বিপর্যয় এড়াতে ভূগর্ভের জলস্তর রক্ষা করার ডাক

Solar Energy Industry in India & Its Future Prospects

NIESBUD Entrepreneurship Development Program on Solar Energy

Sustainable Community Development

IST-Magazine India Sets Year-on-Year Targets to Reach Ambitious 2022 Solar Goal

IST-Magazine Solar Energy Applications for Agriculture in India

Labels

Show more