Tuesday, 26 August 2014

ADVANCE CERTIFICATE IN PHOTOVOLTAIC SYSTEM INSTALLATION

ENTREPRENEURSHIP TRAINING


Short Term Training
Long Term Training
Home Study *
Advanced Certificate in Photovoltaic System Technician - 



Duration: 1 Month/80 Hours
Class Time: Monday to Friday - 4 Hours/day 
More>> 

Advanced Certificate in Photovoltaic System Business Management 

Duration: 3 Weeks/60 Hours 
Class Time: Monday to Friday - 4 Hours/day More>> 

Advanced Certificate in Photovoltaic System Installer

Duration: 3 Weeks/70 Hours 
Class Time: Monday to Friday - 5 Hours/day  More>> 

Advanced Certificate in Photovoltaic Power Plant Maintenance

Duration: 3 Weeks/70 Hours 
Class Time: Monday to Friday - 4.5 Hours/day More>> 

Certificate in Photovoltaic Module Manufacturing Process

Duration: 2 Weeks/50 Hours 
Class Time: Monday to Friday - 5 Hours/day  More>>
Advanced Certificate in Photovoltaic System Technician - 



Duration: 6 Months 
Class Time: Saturday and Sunday - 2 Hours/day 
More>> 

Advanced Certificate in Photovoltaic System Business Management 

Duration: 6 Months 
Class Time: Saturday and Sunday - 2 Hours/day More>> 

Advanced Certificate in Photovoltaic System Installer

Duration: 6 Months 
Class Time: Saturday and Sunday - 2 Hours/day  More>> 

Advanced Certificate in Photovoltaic Power Plant Maintenance

Duration: 6 Months 
Class Time: Saturday and Sunday - 2 Hours/day More>> 

Certificate in Photovoltaic Module Manufacturing Process

Duration: 3 Months 
Class Time: Saturday and Sunday-2 Hours/day More>>
Advanced Certificate in Photovoltaic System Technician - 



Duration: 6 Months 
Class Time: Two days Practical Class & online support More>> 

Advanced Certificate in Photovoltaic System Business Management 

Duration: 6 Months 
Class Time: Two days Practical Class & online support More>> 

Advanced Certificate in Photovoltaic System Installer

Duration: 6 Months 
Class Time: Two days Practical Class & online support More>> 

Advanced Certificate in Photovoltaic Power Plant Maintenance

Duration: 6 Months 
Class Time: Two days Practical Class & online support More>> 


* Home Study: This is combine synchronous and asynchronous learning to create a structure in which the student is required to meet at a specific time in practical classroom[1] or online support (Internet chat room). Who are engaged in PV system job, can enroll in this system. However, they are allowed to complete assignments on their own time and may pass through an examination.



Wednesday, 6 August 2014

Solar system in rural remote area

Installation of Solar Home Systems in Bangladesh. Source: wbcarbonfinance.org 
Jisnu offers Rural Stand Alone Systems meant for remote villages where there is no grid connectivity.
Sources - jisnusolar.com 
“This program is aimed at the poorest people, those who lack access to electric lighting and still use oil lamps, spending their own resources to pay for fuels that harm their health,” said Jorge Merino, Peru’s Energy and Mining Minister.
Source: 
http://spectrum.ieee.org
Solar can Power Even the Remotest Villages 


Installation of a off-grid PV system in Tanzania. Solar PV modules for rural electrification by SCHOTT in Indonesia. Pictures: Energiebau Solarstromsysteme GmbH; SCHOTT Solar In developing countries, the need for photovoltaic technologies to provide electricity to remote houses and villages is great, while the ability of remote populations to afford the technology remains poor. Problems with supplying these remote areas with PV systems include the inability to afford a system, lack of credit, lack of maintenance, poor or no training, theft, poor administration, and difficulties working with governments. In urban areas of developing countries, conventional utility electricity is often priced below the cost of production, providing an effective barrier to grid-connected PV technologies. One of the biggest problems confronting suppliers of PV to the developing world remains the difficulty of coordinating and working with different government departments. Other problems include graft, lack of a local PV industry, and taxes that increase the difficulty of selling to developing countries (rendering the price of the product beyond local affordability). The current shortage of raw material has recently made sales to the developing world unattractive to manufacturers of product.


Friday, 1 August 2014

Solar System Installation Hand Tools and Materials

Multi Contact ConnectorMulti-contact connectors, (MC connectors) :  Connecting solar modules together in Parallel can be easy as well, if you have the right products. MC connectors provide a connection between the solar modules and Combiner Boxes. Most solar modules are now manufactured with Multi-contact connectors, (MC connectors, for short) which make for an easy Series connection. 


Solar Male & Female Branch Connector:
These waterproof branch connectors make it possible to parallel or series parallel wire PV modules with solar output cables.  Maximum current allowed through connectors is 30 amps.



Portable kit portable solar power system portable solar panel outdoor equipment:


40A, 12v/24v auto mppt Solar Charge Controller:


Home solar inverter with built-in charge controller 300w:

solar cable clipping tools:



Press Release